少妇野外一级内射婬片免费放,爆乳无码av一区二区三区,麻豆国产精品无码视频欧美变态另类残忍视频,久久久久精品久久久久影院蜜桃,少妇被又大又粗又爽毛片黑人无码乱码av天堂一区二区,久久ri精品高清一区二区三区,人妻洗澡被强公日日澡,日日躁夜夜躁夜夜揉揉

大連注塑成型
Your current location : Home >>  news >> Technical support

Contact UsContact Us

Dalian Jinghe Molding Co., Ltd

Dalian Chenghua plastic products Co., Ltd

Tel:0411-87840676

Fax:0411-87840576

Web:m.ganaelle.com/en

E-mail:office@dlchenghua.cn

              office@dljinghe.com

Add:No. 343, Jinwan Road, Zhanqian Street (Majia New Village), Jinzhou District, Dalian

Problems in injection molding

release date:2021-06-22 00:00 source: http://m.ganaelle.com Click:

The pressure in the injection molding process includes plasticizing pressure and injection pressure, which directly affects the plasticization of plastics and the quality of products.


1. Plasticizing pressure:


(back pressure) when the screw injection machine is used, the pressure on the molten material at the top of the screw when the screw rotates and retreats is called plasticizing pressure, also known as back pressure. This pressure can be adjusted by the overflow valve in the hydraulic system.


In injection, the plasticizing pressure needs to change with the screw design, product quality requirements and different types of plastics. If these conditions and the screw speed remain unchanged, increasing the plasticizing pressure will strengthen the shear effect, that is, it will increase the melt temperature, but it will reduce the plasticizing efficiency, increase the countercurrent and leakage flow and increase the driving power.


In addition, increasing the plasticizing pressure can often make the temperature of the melt uniform, the color mixture uniform and discharge the gas in the melt. In general, in operation, the plasticizing pressure should be determined as low as possible on the premise of ensuring good product quality. The specific value varies with the variety of plastics used, but it usually rarely exceeds 20 kg / cm2.


2. Injection pressure:


In the current production, the injection pressure of almost all injection machines is based on the top of the plunger or screw to the plastic


The applied pressure (converted from oil circuit pressure) shall prevail. The role of injection pressure in injection molding is to overcome the flow resistance of plastic from the barrel to the cavity, give the melt filling rate and compact the melt.


The time required to complete an injection molding process is called molding cycle, also known as molding cycle. It actually includes the following parts:


Molding cycle: the molding cycle directly affects labor productivity and equipment utilization. Therefore, in the production process, the relevant time in the forming cycle should be shortened as far as possible on the premise of ensuring the quality. In the whole molding cycle, injection time and cooling time are the most important, which have a decisive impact on the quality of products.


The mold filling time in the injection time is directly inversely proportional to the mold filling rate, and the mold filling time in production is generally about 3-5 seconds. The pressure holding time in the injection time is the pressure time on the plastic in the mold cavity, which accounts for a large proportion in the whole injection time, generally about 20-120 seconds (for extra thick parts, it can be as high as 5-10 minutes).


Before the molten material at the gate is frozen, the holding time has an impact on the dimensional accuracy of the product. If it is later, it has no impact. Pressure holding time also has a favorable value. It is known that it depends on material temperature, mold temperature and the size of sprue and gate. If the size and process conditions of sprue and gate are normal, the pressure value with the smallest fluctuation range of product shrinkage shall prevail.


The cooling time mainly depends on the thickness of the product, the thermal and crystallization properties of the plastic, and the mold temperature. The end point of the cooling time shall be based on the principle of ensuring that the product will not change during demoulding. The cooling time is generally about 30 ~ 120 seconds. It is unnecessary to have a long cooling time, which will not only reduce the production efficiency, but also cause demoulding difficulties for complex parts, and even produce demoulding stress during forced demoulding. The other time in the forming cycle is related to the continuity and automation of the production process and the degree of continuity and automation.


Dalian injection molding


Related tags: Dalianinjectionmolding

  • Add:No. 343, Jinwan Road, Zhanqian Street (Majia New Village), Jinzhou District, Dalian
    Add:No. 343, Jinwan Road, Zhanqian Street (Majia New Village), Jinzhou District, Dalian
  • E-mail:office@dlchenghua.cn
    E-mail:office@dlchenghua.cn
  • Tel:0411-87840676
    Tel:0411-87840676
Professional production enterprise engaged in plastic injection molding, extrusion and blow molding

1637907000586125.png

Wechat        Mobile

Dalian Chenghua plastic products Co., Ltd

Dalian Jinghe Molding Co., Ltd

中国老太卖婬HD播放| 日文字体乱码一二三四最新| 国产一区二区三区观看| 久久天天躁日日躁狠| 亚洲人成在线观看影院| 欧美日韩国产综合视频一区二区二| 国产高清午夜精品福利色噜| 扒开双腿疯狂进出爽爽爽视频| 综合区精品久久久中文字幕一区| 国产内射一区亚洲| 人妻少妇久久中文字幕| 公车上雪柔被猛烈的进出| 国产亚洲午夜高清国产拍精品| 亚洲免费片,午夜看一级特黄a大片| 真人一级毛片免费无码婬片AAAA片直播| 叫床很激烈的年轻水嫩大学生| 久久精品夜色国产亚洲AV| 色综合久久久久久久久五月| 久久久久无码精品国产蜜桃| 日本中文字幕二区区高清| 色综合久久天天综线观看| 久久精品AⅤ无码中文字字幕| 中文字字幕日韩在线电影| 国产在线播放一区二区| 精品国产A∨无码一区二区三区| 亚洲国产欧美在线人成精品一区二区| 蜜臀aⅤ色欲a片无码精品| 久久久久国产精品嫩草影院| 中文字幕人妻无码一夲道| 内射白浆一区二区在线观看| 欧美激情XXXⅩBBBBB| 欧美成人精品一区二区久久久| 国产午夜三级一区二区三| 亚洲无码精品在线观看| 国产精品三级在线观看| 乱伦欧美国产免费| 1V1好爽要喷水了H| 日产一线二线三线网站| 学生被强奷到高潮喷水在线观看| 免费观看A级毛片| 久久9999久久免费精品国产|